- Use an MCS-certified installer: it is the route to Smart Export Guarantee payments, consumer code protection and, since 27 October 2026, Warm Homes loans.
- Check membership of RECC, HIES or GGF, and ask for an insurance-backed guarantee.
- Get at least three quotes, each with a survey and a written generation estimate.
- Pay no more than 25% as a deposit, ideally by credit card, and never pay in full upfront.
- Walk away from pressure selling, cold calls about free solar and quotes without a survey.
The installer you choose matters more than the panels they fit. A well-designed system from a careful installer will outperform premium panels fitted badly, and the installer is who you depend on if anything goes wrong in the decades your panels should be generating.
The good news is that the checks that separate a good solar panel installer from a risky one are quick to do and mostly free. Here are nine to work through before you sign anything, plus the red flags that should make you walk away.
Why the installer matters more than the brand
MCS, the body that certifies small-scale renewable installers, puts it plainly: the two things that decide how well a system performs are its design and its installation, and the equipment is often of secondary importance. The best panels on the market will disappoint if they are on the wrong roof face, shaded, wired poorly or sized without looking at how you use electricity.
The installer also controls your paperwork. Without the right certificate, you cannot claim export payments, and without the right guarantees, you have nothing to fall back on if the company closes.
The nine checks at a glance
{{table:solar-installer-checks}}
The nine checks in detail
1. Are they MCS certified for solar PV?
MCS certification is the baseline. It means the business has passed an assessment of its working practices and has one of its installations audited every year. It also matters financially: MCS certification is a prerequisite for Smart Export Guarantee payments for the electricity you export.
Updated 16 November 2026: since 27 October 2026, MCS certification is also required for solar panel and battery installations paid for with a Warm Homes Loan Scheme loan. Some lenders work only with particular installers, while others let you choose any MCS-certified firm, so check which applies before you commit. Our post on Warm Homes loans and MCS installers has more.
Do not take a logo on a van or website as proof. Check the company's name and certificate number on the MCS website's installer search, and make sure they are certified for solar PV specifically, and for batteries too if you are having one fitted.
2. Which consumer code do they belong to?
Every MCS installer must belong to a consumer code approved by the Chartered Trading Standards Institute: the Renewable Energy Consumer Code (RECC), the Home Insulation and Energy Systems scheme (HIES) or the Glass and Glazing Federation (GGF). These codes set standards for selling, contracts, deposits and complaints that go beyond basic consumer law, and they give you somewhere to turn if a dispute cannot be settled with the installer. Ask which one, then check the membership on the code's own website.
3. Will they provide an insurance-backed guarantee?
Consumer codes require their MCS members to offer an insurance-backed guarantee. It underwrites the installer's workmanship guarantee, so if you need to claim and the installer has stopped trading, the insurer steps in. Ask who provides it, how long it lasts, and make sure you receive the policy document after installation.
4. Did they survey your home properly?
A reliable quote comes after someone has looked at your roof, your consumer unit and your electricity use, either in person or with a detailed remote survey using roof measurements and photos. MCS installers are required to assess your energy needs before proposing a system. A firm that quotes a price over the phone without asking how much electricity you use is guessing.
5. Have they given you a written performance estimate?
Before you sign, you should have a written estimate of how many kWh your system will generate in a year, specific to your property. It should show the system size, the regional yield figure and any shading factor. Our guide to how many solar panels you need explains how to check that the figure is realistic.
6. Is the quote fully itemised?
A good quote names everything, so you can compare like with like:
- panel make, model, wattage and number
- inverter make and model, and whether it can take a battery later
- battery make, model and usable capacity, if included
- mounting system, scaffolding and any bird protection
- electrical work, isolators and any consumer unit upgrade
- notifying or applying to your electricity network operator
- monitoring app or display
- MCS certificate and handover documents
- start date, how long the work will take, and the payment schedule
Missing items are where extra costs appear later.
7. How much deposit do they want, and how?
MCS advises never paying more than 25% of the total contract price as a deposit. Pay it by credit card if you can: for a deposit between Β£100 and Β£30,000, your card provider should be able to help you get your money back if the system is never installed, and many providers protect the whole purchase even when only the deposit went on the card. Never pay in full before the work is done.
8. Who will actually do the work?
Under MCS rules, the installer delivering your system must have a contract directly with you and be certified for the technology they install. Some sales-led firms pass jobs to subcontractors. Ask who will be on your roof, whether they are employees, and who signs off the electrical work.
9. What happens after installation?
Ask about aftercare before you buy, not after. MCS installers must give you a handover pack including the manufacturers' guides and your MCS certificate. Check:
- the length of the workmanship guarantee and the panel, inverter and battery warranties
- who you call if output drops or the inverter shows a fault
- whether they offer servicing, and what it costs
- that you will receive the MCS certificate you need to apply for Smart Export Guarantee payments
Red flags: when to walk away
- Pressure to sign today. "Today only" discounts and offers that expire when the salesperson leaves are designed to stop you comparing quotes.
- Cold calls about free solar. Genuine grants are applied for through official schemes. Our guide to applying for a solar grant explains how they work.
- Claims of being government-approved. MCS certification is a quality scheme, not a government endorsement of one company.
- A large deposit, or full payment upfront. Anything over 25% is above what MCS advises.
- No survey and no written generation estimate. Without them, you cannot tell whether the system suits your home.
- Savings that seem too good. If a quote promises to cut your bill to nothing, ask to see the sums behind it.
How many quotes should you get?
MCS recommends at least three. When you compare them, look past the headline price:
- Divide the price by the estimated annual generation. The cost per kWh a year shows which system gives the most electricity for your money.
- Compare the system size. A cheaper quote is often simply a smaller system.
- Compare guarantee lengths and aftercare, not only the equipment.
- Check the dates. Installing solar panels and batteries currently carries 0% VAT until 31 March 2027, so confirm the installation date on each quote.
Our solar panel costs page shows what typical systems cost, so you can spot a quote that is far out of line in either direction.
Do you need a local solar panel installer?
Not necessarily, but local presence helps with aftercare. A firm based within reach of you can return quickly if something needs attention. National firms can be just as good, provided the nine checks above are met, and especially check eight: whether their own team or a subcontractor will do the work.
Whichever you choose, reviews are useful only alongside the checks. Look for recent reviews that mention aftercare and how problems were handled, not just how polite the sales visit was.
What happens once you have chosen
Once you accept a quote, the installer handles the technical steps: the final design, any network operator approval, scaffolding, installation, commissioning and your MCS certificate. Our solar panel installation checklist walks through each stage, so you know what should happen and when.
Where to go next
- Check what size of system you need with our guide to how many solar panels you need.
- Weigh up the return in are solar panels worth it?
- Thinking about storage too? Read our solar battery storage guide.
- New to solar? Start with our solar panel buying guide.
Common questions
Do I need an MCS-certified installer?
You are not legally required to use one, but without MCS certification you cannot claim Smart Export Guarantee payments, and you lose the consumer code protection and insurance-backed guarantee that come with it. Since 27 October 2026, you also need one to use a Warm Homes loan for solar panels or a battery. For a rooftop system, it is the sensible choice.
What is the difference between RECC and HIES?
Both are consumer codes approved by the Chartered Trading Standards Institute. They set rules on how installers sell, write contracts, take deposits and handle complaints. Either gives you protection, and every MCS installer must belong to one of them or to the GGF.
What happens if my solar installer goes out of business?
Your insurance-backed guarantee covers the workmanship guarantee the installer gave you, and the manufacturers' warranties on the panels, inverter and battery stay in place. Keep your handover pack, MCS certificate and guarantee documents somewhere safe.
How do I find solar panel installers near me?
Use the MCS installer search to find certified firms in your area, then work through the nine checks above. You can also ask us for quotes, and we will match you with MCS-certified installers who cover your postcode.
Should I choose the cheapest quote?
Only if it passes every check and offers a similar system size, equipment and guarantees to the others. The cheapest quote is often a smaller system or leaves out items, such as scaffolding or bird protection, that appear as extras later.
Sources
- MCS, Your renewable installation. Checked 11 November 2026.
- Ofgem, Smart Export Guarantee. Checked 11 November 2026.
- Department for Energy Security and Net Zero, Warm Homes Loan Scheme: factsheet, published 27 October 2026. Checked 16 November 2026.
- MCS, MCS certified installers to deliver Warm Homes Loan Scheme. Checked 16 November 2026.
Compare quotes from certified installers
Tell us your postcode and we will put you in touch with MCS-certified installers for a free, no-obligation quote.
Free and no obligation. We only share your details with the installers we match you with.
What the accreditations actually mean
Certification is the clearest signal you have that an installer is competent, and that you are protected if something goes wrong. Here is what each one covers.
Nine checks before choosing a solar installer
What to confirm with any installer before you sign a contract or pay a deposit.





